156units · 3 alarm · 10 watch
2live jobs
$141,700invoiced (ex GST)
$132,257owing · 45 days EOM
Contacts
| Name | Role | Phone | ||||
|---|---|---|---|---|---|---|
| Nick Coleman | Maintenance Superintendent | nick.coleman@ulan.glencore.com.au | 02 5910 7678 | Primary | Portal access | |
| Luke Hennessy | Longwall Engineer | luke.hennessy@ulan.glencore.com.au | 02 5521 8860 | — | Portal access | |
| Michelle Brennan | Mechanical Engineer | michelle.brennan@ulan.glencore.com.au | 02 6296 6849 | — | — | |
| Cameron Brennan | Supply Officer | cameron.brennan@ulan.glencore.com.au | 02 4202 7515 | — | — | |
- Address
- Ulan Road, Ulan NSW 2850
- ABN
- 46 240 944 120
- Terms
- 45 days EOM
- Panel
- LW W6
- Run hours
- 132 h / week
- Customer since
- 02 Apr 2022
- Portal
- Live — last viewed 06 Oct 2026 · 22:51
Local — 40 min from the Mudgee workshop. Face crews on 12 h rotating roster.
Quotes
Q-26-0445 Pin & bush sets — shields 84–90 (pin clearance)05 Oct 2026 · $33,802
DraftQ-26-0447 LW W6 → LW W7 longwall relocation24 Sep 2026 · $902,884
SentQ-26-0415 Exchange leg overhaul — 24 × 400 mm legs (W6 rotation pool)26 Aug 2026 · $154,800
AcceptedQ-26-0427 Shield base-lift cylinder modification — design review24 Jul 2026 · $12,480
AcceptedQ-26-0411 LW W6 face — onsite roof support overhaul, shields 1–7406 Jul 2026 · $507,241
AcceptedQ-26-0431 AFC maingate gearbox — exchange overhaul21 Jun 2026 · $77,300
AcceptedQ-26-0436 Condition monitoring program FY27 — Ulan West Operations15 Jun 2026 · $257,600
AcceptedJobs
J-26-0185 Exchange leg overhaul — 24 × 400 mm legs (W6 rotation pool)Offsite overhaul · $154,800
In progressJ-26-0197 Shield base-lift cylinder modification — design reviewEngineering · $12,480
CompleteJ-26-0181 LW W6 face — onsite roof support overhaul, shields 1–74Onsite overhaul · $507,241
CompleteJ-26-0201 AFC maingate gearbox — exchange overhaulOffsite overhaul · $77,300
InvoicedJ-26-0206 Condition monitoring program FY27 — Ulan West OperationsCondition monitoring · $257,600
In progress