7units monitored
1in alarm
0on watch
01 Oct 2026 · 07:51latest reading
Nownext change-out · MD-BSL-01
Drives, shearer, pumps & mobile plantlatest reading per parameter
| Unit | Latest readings | Health | Life used · change-out |
|---|---|---|---|
| MD-AFC-MG AFC maingate drive · Komatsu 1,000 kW planetary drive | Chain 0.65 % Sprocket 2.8 mm Fe 49 ppm Vib 3.3 mm/s Oil °C 67 | ✓ OK | 4,706 / 14,000 h Change-out 09 Apr 2028 · Run hours |
| MD-AFC-TG AFC tailgate drive · Komatsu 1,000 kW planetary drive | Chain 0.97 % Sprocket 3.8 mm Fe 70 ppm Vib 4.4 mm/s Oil °C 71 | ✓ OK | 7,232 / 14,000 h Change-out 11 Nov 2027 · Run hours |
| MD-BSL-01 Beam stage loader drive · Komatsu 525 kW BSL drive | Chain 2.61 % Sprocket 4.1 mm Fe 77 ppm Vib 6.5 mm/s Oil °C 81 | ▲ Alarm | 12,900 / 14,000 h Change-out now · Chain elongation |
| MD-PS-01 Emulsion pump station 1 · Zhongmei (PSS) BRW630/37.5 | Emulsion 4.8 % Pressure 352 bar Fe 72 ppm Vib 4.4 mm/s Oil °C 70 | ✓ OK | 6,803 / 16,000 h Change-out 04 Apr 2028 · Run hours |
| MD-PS-02 Emulsion pump station 2 · Zhongmei (PSS) BRW630/37.5 | Emulsion 4.9 % Pressure 357 bar Fe 63 ppm Vib 3.6 mm/s Oil °C 69 | ✓ OK | 8,056 / 16,000 h Change-out 20 Jan 2028 · Run hours |
| MD-SHR-MG Shearer ranging arm — maingate · Eickhoff SL 500 ranging arm | Fe 67 ppm Vib 4.2 mm/s Oil °C 70 | ✓ OK | 5,672 / 9,000 h Change-out 21 Apr 2027 · Run hours |
| MD-SHR-TG Shearer ranging arm — tailgate · Eickhoff SL 500 ranging arm | Fe 61 ppm Vib 3.8 mm/s Oil °C 69 | ✓ OK | 3,691 / 9,000 h Change-out 17 Aug 2027 · Run hours |
Forecast change-outsat 118 run-hours / week
| Unit | Driver | Hours left | Change-out |
|---|---|---|---|
| MD-BSL-01 Beam stage loader drive | Chain elongation | 1,100 | Now |
| MD-SHR-MG Shearer ranging arm — maingate | Run hours | 3,328 | 21 Apr 2027 |
| MD-SHR-TG Shearer ranging arm — tailgate | Run hours | 5,309 | 17 Aug 2027 |
| MD-AFC-TG AFC tailgate drive | Run hours | 6,768 | 11 Nov 2027 |
| MD-PS-02 Emulsion pump station 2 | Run hours | 7,944 | 20 Jan 2028 |
| MD-PS-01 Emulsion pump station 1 | Run hours | 9,197 | 04 Apr 2028 |
| MD-AFC-MG AFC maingate drive | Run hours | 9,294 | 09 Apr 2028 |
Recommendations1 open
MD-BSL-01 — BSL chain elongation 2.6 % — beyond limit
Replace chain and sprocket set at next production stoppage.
CMA-1209 · raised 01 Oct 2026 · Quote with you
Open Recent roundsAll readings →
| Round | When | Source | By | Readings | Watch | Alarm |
|---|---|---|---|---|---|---|
| CM-26-0360 | 01 Oct 2026 · 07:30 | Weekly inspection | Sophie Lindqvist | 31 | 0 | 1 |
| CM-26-0359 | 24 Sep 2026 · 07:30 | Weekly inspection | Sophie Lindqvist | 18 | 0 | 0 |
| CM-26-0358 | 17 Sep 2026 · 07:30 | Weekly inspection | Sophie Lindqvist | 31 | 1 | 0 |
| CM-26-0357 | 10 Sep 2026 · 07:30 | Weekly inspection | Sophie Lindqvist | 18 | 0 | 0 |
| CM-26-0356 | 03 Sep 2026 · 07:30 | Weekly inspection | Sophie Lindqvist | 31 | 1 | 0 |
| CM-26-0355 | 27 Aug 2026 · 07:30 | Weekly inspection | Sophie Lindqvist | 18 | 0 | 0 |