Moolarben Underground · condition monitoring
Yancoal · LW 107 · prepared by Phoenix Underground, Mudgee
Live · updated 01 Oct 2026 · 09:13
143units monitored
1in alarm
4on watch
01 Oct 2026 · 09:13latest reading
Nownext change-out · MO-RS-041
LW 107 face — 136 roof supportsCaterpillar 2-leg shield 1,250 t · click a shield for its history
GoodWearingWatchAlarm
◀ Maingate · shield 1LW 107shield 136 · Tailgate ▶
Flagged: 018019041102
MO-RS-106 Shield 106 · Caterpillar 2-leg shield 1,250 t ✓ OK✕
19,326 / 22,000 h Change-out 04 Mar 2027 · Run hours
Leg set pressure (bar)
347
285 320 16 Jul: 352 bar23 Jul: 353 bar30 Jul: 354 bar6 Aug: 351 bar13 Aug: 353 bar20 Aug: 351 bar27 Aug: 352 bar3 Sep: 352 bar10 Sep: 350 bar17 Sep: 348 bar24 Sep: 351 bar1 Oct: 347 bar 16 Jul27 Aug1 Oct
Leg pressure loss over shift (%)
7
15 8 16 Jul: 6.3 %23 Jul: 6 %30 Jul: 6.6 %6 Aug: 6.2 %13 Aug: 6.5 %20 Aug: 6.6 %27 Aug: 6.4 %3 Sep: 6.6 %10 Sep: 6.6 %17 Sep: 7.1 %24 Sep: 7.2 %1 Oct: 7 % 16 Jul27 Aug1 Oct
Pin & bush clearance (mm)
1.49
3 2 23 Jul: 1.34 mm6 Aug: 1.35 mm20 Aug: 1.4 mm3 Sep: 1.43 mm17 Sep: 1.51 mm1 Oct: 1.49 mm 23 Jul3 Sep1 Oct
Leg chrome damage rating (/5)
1
4 2 23 Jul: 1 /56 Aug: 1 /520 Aug: 1 /53 Sep: 1 /517 Sep: 1 /51 Oct: 1 /5 23 Jul3 Sep1 Oct
Drives, shearer, pumps & mobile plantlatest reading per parameter
UnitLatest readingsHealthLife used · change-out
MO-AFC-MG
AFC maingate drive · Caterpillar 855 kW planetary drive
Chain 0.79 % Sprocket 3.3 mm Fe 60 ppm Vib 3.5 mm/s Oil °C 68
✓ OK
7,331 / 14,000 h Change-out 12 Oct 2027 · Run hours
MO-AFC-TG
AFC tailgate drive · Caterpillar 855 kW planetary drive
Chain 1.06 % Sprocket 4.3 mm Fe 80 ppm Vib 4.5 mm/s Oil °C 71
✓ OK
9,135 / 14,000 h Change-out 03 Jul 2027 · Run hours
MO-BSL-01
Beam stage loader drive · Caterpillar 525 kW BSL drive
Chain 0.67 % Sprocket 3.1 mm Fe 86 ppm Vib 4.7 mm/s Oil °C 72
✓ OK
7,971 / 14,000 h Change-out 06 Sep 2027 · Run hours
MO-PS-01
Emulsion pump station 1 · Zhongmei (PSS) BRW630/37.5
Emulsion 4.6 % Pressure 347 bar Fe 89 ppm Vib 4.9 mm/s Oil °C 73
✓ OK
10,021 / 16,000 h Change-out 03 Sep 2027 · Run hours
MO-PS-02
Emulsion pump station 2 · Zhongmei (PSS) BRW630/37.5
Emulsion 4.3 % Pressure 354 bar Fe 71 ppm Vib 5.8 mm/s Oil °C 70
● Watch
11,426 / 16,000 h Change-out 10 Jan 2027 · Emulsion concentration
MO-SHR-MG
Shearer ranging arm — maingate · Caterpillar EL3000 ranging arm
Fe 50 ppm Vib 4.1 mm/s Oil °C 66
✓ OK
3,079 / 9,000 h Change-out 31 Aug 2027 · Run hours
MO-SHR-TG
Shearer ranging arm — tailgate · Caterpillar EL3000 ranging arm
Fe 54 ppm Vib 3.7 mm/s Oil °C 67
✓ OK
3,347 / 9,000 h Change-out 16 Aug 2027 · Run hours
Forecast change-outsat 126 run-hours / week
UnitDriverHours leftChange-out
MO-RS-041 Shield 41 Leg chrome damage rating 9,875 Now
MO-PS-02 Emulsion pump station 2 Emulsion concentration 4,574 10 Jan 2027
MO-RS-090 Shield 90 Run hours 2,677 04 Mar 2027
MO-RS-106 Shield 106 Run hours 2,674 04 Mar 2027
MO-RS-093 Shield 93 Run hours 2,760 08 Mar 2027
MO-RS-080 Shield 80 Run hours 2,915 17 Mar 2027
MO-RS-077 Shield 77 Run hours 2,970 20 Mar 2027
MO-RS-019 Shield 19 Leg pressure loss over shift 13,124 21 Mar 2027
MO-RS-136 Shield 136 Run hours 2,994 21 Mar 2027
MO-RS-111 Shield 111 Run hours 3,180 01 Apr 2027
MO-RS-102 Shield 102 Pin & bush clearance 6,149 03 Apr 2027
MO-RS-128 Shield 128 Run hours 3,212 02 Apr 2027
Recommendations2 open
MO-RS-041 — Leg chrome rated 4/5 — seal-cutting damage on inner leg
Exchange leg before seals fail; check neighbouring shields 39–43 at next round.
CMA-1202 · raised 01 Oct 2026 · Open
MO-PS-02 — Emulsion concentration below 4.5 %
Check proportioner and concentrate supply; re-test within 24 h.
CMA-1203 · raised 01 Oct 2026 · Open
Phoenix UndergroundQuestions about a reading? Sophie Lindqvist, Condition Monitoring Lead · (02) 8074 4988 Limits: your site's agreed watch / alarm values. Change-outs forecast from run-hours and wear trend.
Built for Phoenix Underground by Praxa Tech · Custom build, owned by Phoenix Underground on final payment.